All of the old asphalt, 1,500 (and still counting) old tires, and all the scrap metal from the site is being removed and recycled. Even the metal building that existed on the site was reused: it was carefully disassembled and relocated to another property.
This 99% construction site recycling program not only removes potentially environmentally harmful waste from the site and it’s proximity to the Winslow Ravine, it greatly reduces the gross waste of building materials that can still be useful in a host of ways. For example, recycled tires can be cleaned and shredded for use as safe padded flooring for gyms and playgrounds. And the direct re-use of building materials reduces cost and avoids the need for new materials.
We’re taking this so seriously that we have a “pack it in, pack it out” policy for all work crews on the site. No leaving your lunch behind. Unless, of course, it can be recycled!
Recycling works!
Happy Earth Month!